HS2 finishes Westbury viaduct, built with a design it says cuts carbon 39–59%
The 320-metre HS2 Westbury viaduct over a River Great Ouse floodplain near Brackley is complete, and contractor EKFB says it is the first of five double composite viaducts finished.