Track Tools for Railway Maintenance and Repair Works

Track maintetnace tools and equipment

Hand operated tools and machines for rail are widely used for track construction and maintetnace. They are mandatory for the safe and efficient railway transport operations.

RGU-1M group-type motor straightener

The group-type motor straightener is designed for straightening of tracks and switch pointes laid on timber and cast sleepers during repair and routine track maintenance. It is assembled of 4 straighteners in one group operated by a gasoline-station or by a hand pump mounted on the trolley.

Maximum straightening force, ton-force30
Hydraulic fluid pressure, kg/cm²100
Piston stroke, mm120
Overall dimension (height/width/length), mm                                                                  950х600х1055
Weight of straightener, kg13,2
Weight of complete set, kg125

BGM-01.50-180 gasoline impact wrench

BGM-01.50-180 gasoline impact wrench

BGM-01.50-180 gasoline impact wrench is designed for mounting and dismounting operations in conditions when use of electrical, pneumatic or hydraulic wrenches is difficult or impossible.

The gasoline impact wrench allows to carry out mounting and dismounting of rigid threaded joints, making drills on railway tracks, bridgeworks, power transmission lines and other structures under difficult field conditions and absolutely independently. When used for repair of railway tracks the impact wrench allows to do and undo terminal, embedded and fishplate bolts, tighten screw spikes and make drills in timber sleepers for hook-headed spike and screw spikes.

Rail Cutter VR-1

Rail Cutter VR-1

Rail Cutter VR-1 is intendent for efficient and fast cutting of maximum strength rails and used for track construction and maintetnace.

DriveAir cooled two-cycle petrol engine 
Engine typeStihl TS800
Engine output5,0 kW at 9000 rpm
Max. cutting disc speed 4290 rpm
Cuttig time (approx.)2 min
Cutting disc size400х4,0х32 mm
Disc circumferential speed80 m/s

Rail Grinder VSR-1

Rail Grinder VSR-1 is designed for the fine finishing of the rail head running surface and its flanks.  

Rail Grinder has two modifications :

  • VSR-1-01 — basic model with rollers for the grinding the defects after butt welding, surfacing and cold working. It can also be used for the removal of rail corrugations up to 300 mm
  • VSR-1 — model without rollers for the removal of all above mentioned deffects except rail corrugations.

PPZR-1000 mobile machine for rail replacement

PPZR-1000 mobile machine for rail replacement

PPZR-1000 mobile machine is designed for replacement and shifting of all types of rails along tracks with standard gage during repair and routine track maintenance.

Crane lifting capacity, t1
Handle force during lifting of load, kgf8
Handle force during travel of trolley with maximum load, not more than, kgf16
Crane travel force while on track with maximum load, not more than, kgf25
Rail side travel, mm1100
Lifting height, mm450
Overall dimension (height/width/length), mm986х860х1756
Weight, kg80

PP «PROM-ALLIANCE»

Hydraulic and electrical track equipment

www.gdc.com.ua

UKRAINE

61072, Kharkiv

vul. Tobolska, 42, of. 406

+380 57 717-56-01

+380 57 758-69-82

+380 93 152-04-32

Railway magazine “Railway Supply”

Find the latest news of the railway industry in Eastern Europe, the former Soviet Union and the rest of the world on our page on Facebook, Twitter, LinkedIn, read Railway Supply magazine online.

Place your ads on webportal and in Railway Supply magazine. Detailed information is in Railway Supply media kit