Czech Railways has the first drawbridge
28.04.2021
Czech Railways has the first drawbridge
Luzhecky railway bridge is the first drawbridge on the Czech railway. The 135-ton axle is lifted by four hydraulic cylinders. The lifting of the bridge is fully automated, informs Railway Supply magazine with reference to Zdopravy.

The entire bridge, 29 meters long, was built on the ruins of the former bridge, where new pillars were built instead of the original stone ones.
Rail Baltica seeks contractor for building longest railway bridge in the Baltic States
According to the Czech Ministry of Infrastructure, the test passed without a hitch. According to the Czechs, they used an oblique rail joint, which should ensure safe disconnection when lifting the bridge, but above all, ensures the safe passage of the train. The aim of the reconstruction of the bridges is to ensure the passage of large ships to Prague.
Related:
The arch of the tallest railway bridge in the world was built
Find the latest news of the railway industry in Eastern Europe, the former Soviet Union and the rest of the world on our page on Facebook, Twitter, LinkedIn, read Railway Supply magazine online.Place your ads on webportal and in Railway Supply magazine. Detailed information is in Railway Supply media kit



