Vossloh Replaces Over 100 Kilometers of Rails in One Month: Record Reconstruction of High-Speed Line
03.09.2024
Vossloh has demonstrated impressive results with its specialized rail replacement train on the high-speed line Cologne–Rhine/Main, this is reported by the railway transport news portal Railway Supply.

In just one month, the train managed to replace over 100 kilometers of rails. The reconstruction process utilized advanced technologies, including flash-butt welding with a unique machine.
New Turin-Lyon Railway Line: How £21 Billion Will Transform Transport in Europe
Additionally, new rails were unloaded and replaced rails were loaded onto the train.
The high speed of operations, reaching 4000 meters of track per shift, significantly reduced rail replacement time and minimized the duration of line closures for trains.
This enabled the reconstruction of one of Germany’s key high-speed corridors, which accommodates 120 ICE trains daily, in record time.
Furthermore, the Vossloh train has proven effective outside Germany as well. In Sweden, for example, it delivered excellent results in repairing the Malmbanan line after two derailments.
Despite challenging weather conditions, damaged rails were swiftly replaced, allowing for the resumption of ore transport from northern mines.
Thus, Vossloh continues to affirm its reputation as a reliable partner in railway infrastructure modernization, providing rapid and efficient rail replacement.
Photo: Vossloh
Rail business, industry, and railway technology news from Railway Supply that you might have missed:
Find the latest news of the railway industry in Eastern Europe, the former Soviet Union and the rest of the world on our page on Facebook, Twitter, LinkedIn, read Railway Supply magazine online.Place your ads on webportal and in Railway Supply magazine. Detailed information is in Railway Supply media kit

