The Chinese CRRC battery tram-train successfully carried passengers for the first time in Argentina
14.12.2023
The trial on a 20-kilometer stretch of the tourist narrow-gauge line from Volcan to Tilcara included the participation of Governor Gerardo Morales, this is reported by the railway transport news portal Railway Supply.
However, the rolling stock will undergo operational tests before the full commercial launch, scheduled for March 2024—eight years later than initially planned due to funding issues, miscalculations, and other factors.
The maneuver locomotive manufacturer is expanding production
The two-car trains, delivered in September under a 2022 contract, are equipped with two lithium iron phosphate batteries totaling 352 kWh, installed on the roof.
The panoramic-windowed interior accommodates 72 passengers, and driver cabins are located on both sides of the train.
Photo: Prensa Jujuy, BuenosAiresImpacto.
Rail business, industry, and railway technology news from Railway Supply that you might have missed:
The operation of the T12 tram-train line has been launched
Find the latest news of the railway industry in Eastern Europe, the former Soviet Union and the rest of the world on our page on Facebook, Twitter, LinkedIn, read Railway Supply magazine online.Place your ads on webportal and in Railway Supply magazine. Detailed information is in Railway Supply media kit



