The Mumbai-Ahmedabad Shinkansen bullet train by Indian Railways will transform travel in two hours covering a distance of 508 kilometers. This was reported by the railway transport news portal Railway Supply.

Indian Railways is revolutionizing travel with the Mumbai-Ahmedabad Shinkansen train, spanning 508 kilometers in two hours
Source, photo: www.travelandtourworld.com

The Mumbai-Ahmedabad Shinkansen Founded in the singather line (1991) and operated under both Japanese and European standards, it boasts the highest speed and convenience. ₹27.86 crore for one train, ₹866.87 crore for the project

State-of-the-art of the Mumbai-Ahmedabad Shinkansen Train

And the Indian Railways adopts Shinkansen technology while focusing on domestic production. The train, with operating speeds of 280 km/h, will slash the travel time between Mumbai and Ahmedabad.

Don’t miss…Strong Year-End Performance by U.S. Railroad Companies Despite Challenges

The high speed train is an initiative of ‘Make in India’ and combines global and local production. The Mumbai-Ahmedabad Shinkansen is a big stride for India, which is grappling with modernisation of its infrastructure.

The overall project cost covers trials, design and enhanced infrastructure. It paves the way for all of the high-speed rail proposals in the country.

Up-to-date facilities offered on the Mumbai-Ahmedabad Shinkansen Train

These bullet trains provide fully air conditioned coaches, high- tech entertainment systems and ergonomic reclining chairs. Access friendly to accomodate special passengers.

The trains are tested at the speed of 280 km/h and the start of the full operation scheduled for 2026. The train corridor will in the end see speeds of 320 km/h and will become a benchmark for efficiency.

The priority section of the Mumbai-Ahmedabad Shinkansen will come on line by 2026. This project should have added connectivity and economic value to the region.

In summaryMumbai is going ShinkansenDo the ride from Mumbai to Ahmedabad in a comfy and sustainable way. By 2026, it wants to revolutionize transport in India.

Source, photo: www.travelandtourworld.com

What is the Mumbai-Ahmedabad Shinkansen train project?

It’s a booming 508-kilometer high-speed rail line that will zip Mumbai and Ahmedabad a quick two hours apart, merging Tokyo’s Shinkansen tech with an Indian touch.

Core-In-06 What are the characteristics and the cost involved in the Shinkansen?

The total cost of the project is ₹866.87 crore, and each train costs ₹27.86 crore. The trains reach speeds of 280 km/h, with predicted speeds of 320 km/h in the future, and are based on cutting-edge design, testing and infrastructure.

When the Mumbai-Ahmedabad Shinkansen be launched?

Testing is currently in process and the first phase of the line is scheduled to start operating in 2026, in the hope of connecting the country, aiding economic growth, and transforming Indian travel.

News on railway transport, industry, and railway technologies from Railway Supply that you might have missed:

Don’t miss…High-Speed Rail Litigation Gains Momentum in Fort Worth-Dallas Development Dispute

Find the latest news of the railway industry in Eastern Europe, the former Soviet Union and the rest of the world on our page on Facebook, Twitter, LinkedIn, read Railway Supply magazine online.

Place your ads on webportal and in Railway Supply magazine. Detailed information is in Railway Supply media kit